Regulation 19 Representation – Policy PP25 (View Park, Abberton and Langenhoe)
Objection: Failure to Secure Safe and Continuous Pedestrian Connectivity
The Parish Council supports the principle of appropriate development at View Park, subject to
the necessary infrastructure being properly secured. However, it objects to Policy PP25 in its
current form because the policy does not contain a clear and effective requirement to provide a
safe, continuous pedestrian connection between the allocated site and the existing village
footway network.
The objection is not that PP25 should unnecessarily duplicate the requirements of other
policies in the Local Plan. The concern is that the general requirements of ST7a and ST8 do not
identify or secure the specific pedestrian infrastructure required for this particular site.
The omission is material to the soundness of PP25 because the allocation needs to be effective
and capable of delivering the sustainable and well-connected development required by the
Local Plan's strategic policies.
ST7a and ST8 establish the strategic objectives, but PP25 does not adequately translate those
objectives into a site-specific infrastructure requirement.
Given the particular pedestrian constraints surrounding the site, this creates uncertainty about
whether the allocation will actually deliver the safe and connected pattern of movement
required by the Local Plan including the primary school, community facilities, shop, public open
space and bus services.
The necessary modification is therefore not simply a request for additional detail. It is necessary
to ensure that the allocation is properly integrated with the existing village and that the
sustainable transport objectives of ST7a and the placemaking requirements of ST8 can be
effectively achieved.
The general requirements of Policies ST7a and ST8 are important, but they do not provide
sufficient site-specific certainty that the necessary pedestrian infrastructure will actually be
delivered at View Park.
The following additional criterion is requested:
"Safe and continuous pedestrian connectivity shall be provided between the development
and the existing village footway network. The route shall be surfaced, accessible and
suitable for year-round use, and shall be delivered at an appropriate early stage of the
development. Any off-site highway or pedestrian improvements necessary to provide a
safe and continuous connection to the existing village footway network shall be identified
and secured as part of the development."
The precise technical design should be agreed with the Highway Authority, but the requirement
for the connection itself should be established clearly in Policy PP25.
This modification would ensure that the allocation is capable of delivering the well-connected,
walking-priortised and sustainable development required by the Submitted Local Plan.